LYSANNE LAFRANCE, ANAÏS LESSARD & ANNIE MORRISSETTE
FIRST MEETING: FEB 15 2019
First discussion on a full lunch hour (1 hour) (all team members were present)
Attendance:
AM: Annie Morrissette
AL : Anaïs Lessard
LL : Lysanne Lafrance
Agenda (what we had to do):
Distribute the tasks
Share ideas about how to design the machine and how to make it work
Sketch a first plan of the machine
Brainstorm about the materials
Get an approximate idea of the price of the machine
Discussion/progress made:
AM: Summed up ideas and description of machine
AL: Created website and interface
LL: Worked on design and took notes
Things to take care of before next meeting and to continue during next meeting (everyone):
Elaborate idea and write description (250 words max)
Find materials
Do problems : introduction 1 science on tourne (each member)
Objectives for next time (when no name is written, everyone needs to participate):
Elaborate ideas
Complete progress check #1
SECOND MEETING: FEB 20 2019
Second discussion and work for 4 hours (video call all evening)
Attendance:
AM
AL
LL
Agenda (what we had to do) :
AM, LL, AL: Develop idea (diagram) and write a paragraph explaining the engine
AM, LL, AL: Decide the materials of the engine
AM, LL, AL: Advance the blog process
AM, LL, AL: Finish the problems
Discussion/progress made:
Everyone worked on the ideas on how the engine will move and turn in a circle
LL: Focused on the design of the machine (the diagrams: side view, bird view and front view)
AM and AL: Wrote the explanation of idea of the machine (revision by LL)
AL: Worked on the blog and posted the new information, submitted link on moodle
Found materials for the machine
Planned progress check #2 and the next reunion
Objectives for next time (when no name is written, everyone needs to participate):
Build the machine (start progress check #2)
Make design of the base and the pulleys and send to the 3D printer
Tests to check if the parts built work and if we need modifications
THIRD MEETING: FEB 27 2019
1 hour shopping for the machine at Rona: AL and LL
Third discussion and work for 2:30 hours (all team members met in person at Annie's house).
Agenda :
***CHANGE IN PLANS: MAJOR MODIFICATIONS FOR THE MACHINE (3D printer, length, etc.)***
*Changes plans for the reunion*
Adjust materials and plans for the machine (ex: some of the materials we have chosen previously were not optimal. While discussing, we chose lighter, more resistant materials).
Make contact with person responsible of 3D printer (broken)
Shop for materials
Continue progress check #2
Discussion/progress made:
AM, LL, AL: Modification of the machine’s materials previously determined (base of the machine, sticks holding the wheels together, wheels, etc.)
AM, LL, AL: List of material that would need to be bought:
Elastic band (roll if possible)
Long stick (to raise the mass)
Rollerblade wheels
LL and AL: went to Rona to shop for the materials
AM, LL, AL: spoke with people to know if they already own some of the materials
AM: made contact to print the base and the pulley with the 3D printer
AM, LL, AL: made sure that the materials for the machine are optimal
AM, LL, AL: planned the steps for building the machine and set a date for the next meeting (AM will be on vacation so separate the tasks that have to be done before progress check #2)
AM, LL, AL: discussed the possibility of a vertical steering wheel or 1 fixed wheel
----------
AM, LL, AL: List of material already owned:
Carbon arrows (x2 to link the wheels together and support them)
Fishing mass
Screws, nails, tools, etc.
Objectives for next time (when no name is written, everyone needs to participate):
Consider the possibility of changing what will be printed with the 3D printer (possible new designs)
LL, AL: Build the machine and complete progress check #2
FOURTH MEETING: MAR 7 2019
AL and LL: met at Réno Dépôt and Lysanne's house (total of 4.5 hours)
Agenda :
Adjust materials for the machine (plans have changed a bit again since last time, some changes affect the materials, their proportions, etc.)
Shop for new materials
Discuss on adjustments required to be made on the machine's plans (accordingly to the changes on the system and the machine (see problems encountered for more details))
Build the machine
Discussion/progress made:
LL, AL: modification of some of the machine’s materials and of the machine's plan
LL, AL: bought new materials
LL, AL: built the machine and filmed the progress made (see progress check #2)
LL, AL: prepared work for when AM comes back (AM on vacation): decorations
Objectives for next time:
AM: Design the basket and send to 3D printer + decorate the machine
AM, LL, AL: finish building the machine
FIFTH MEETING: MAR 10 2019
35 minutes, all members present
Discussion/progress made:
Small meeting when Annie came back from her trip to show her the modifications that have been made on the machine since the last meeting with all members present and to determine what has to be done next (Annie's part, etc.)
Objectives for next time (when no name is written, everyone needs to participate):
AM: Design the basket and print with 3D printer
Attach wheel to base
Attach mass to pole and cord
AM: Decorate :)
Make any necessary adjustments
SIXTH MEETING: MAR 17 2019
All members at Annie's house (total of 8 hours)
Agenda:
Finish building the machine
Test and modify what doesn't work
Decorate the machine
Discussion/progress made (when no name is written, everyone participated)
Modification of the machine's materials and its plan :
The mass of the object is now 1.36 kg (3 pounds)
A thin layer of wood is added under the styrofoam to support the machine and solidify it
There are now 4 back wheels instead of 2 (2 with bearing motion and 2 moving with the shaft)
Plastic blockers were added on all sides of the inner back wheels to help the shaft stay in place
There is no basket because the mass falls more slowly than expected
Finish building the machine
Decorate the machine
AM (2h)
The machine is a boat
Paint all in white with grey windows at the front and side
Objectives for next time (when no name is written, everyone needs to participate):
Test the machine at the school
Move the front wheel at the right angle
Make final adjustments if needed
SEVENTH MEETING: MAR 18 2019
All member present at the playing field under the Kfé étudiant (1.5 hours)
Agenda
Test the machine on the official playing field
Move the front wheel at the right angle so that the machine can move in a cercle
Discussion/progress made (when no name is written, everyone participated)
Modification of the angle of the mat (slightly turned in the same direction as the front wheel)
Modification of the horizontal placement of the carbon arrow for better support
Glue the bearings of the outer back wheels so that they only turn with the carbon arrow (doesn't turn independently of it)
Objectives for next time (what is left to do on the day of the competition) (when no name is written, everyone needs to participate)
AM: finish to decorate :
Add the name of the machine on the side of the "boat"
Add an anchor drawing
Add the logo of collegial international Sainte-Anne at the side of the boat
Do final tests to see if it still works and adjust anything that needs to be adjusted